When the building doesn’t match the paperwork.

How MelRok onboarded a 35,000-point healthcare building automation system across many buildings, reconciled it against inconsistent documentation, and became the source of truth that surfaced costly gaps the drawings hid.

THE SITUATION

A campus-scale BAS, onto the platform

A major healthcare system brought MelRok in to onboard a very large, multi-building automation system for monitoring-based commissioning — tens of thousands of points, dozens of equipment types, spread across many buildings and levels. The plan was simple: get every point reporting and analyzed against the acceptance criteria. The reality was not.

Tens of thousands of points

Across many buildings and levels, in dozens of equipment types.

No single source of truth

No one held an accurate picture of what was actually installed.

Monitoring-based commissioning

The goal: every point reporting, analyzed against acceptance criteria.

THE CHALLENGE

The paperwork didn’t match the building

Documentation ≠ reality

MelRok’s scan found more equipment than the OEM submittals listed — extra units, renamed units, and some that weren’t there at all.

Inconsistent names & types

Cryptic, non-descriptive equipment tags confused even the design team, and the documents couldn’t reliably tell one terminal-unit type from another.

Sheer scale

35,000 points, over 10,000 per gateway — with some controllers too point-heavy to read the conventional way.


THE APPROACH

Onboard at scale when the paperwork can’t be trusted

Infer equipment from the points

When documentation failed, MelRok identified each terminal-unit type from the points that existed — a VAV with no heating-valve point isn’t a VAV with reheat.

Register everything — even the unreadable

Where controllers were too point-heavy to read conventionally, engineers manually registered points, for full coverage instead of blind spots.

Structure the chaos

The system was organized into 70+ analysis notebooks, split by equipment type and by building group and level.

Purpose-built team & prep

Two mechanical engineers plus software support — with the analysis functions coded up front, before onboarding began.

WHAT MELROK SURFACED

What the data revealed that the paperwork didn’t

A true as-built inventory

Reconciling the scan against the submittals gave the client an accurate equipment inventory — extras, renames, and gaps all accounted for.




Missing points & integration gaps

MelRok surfaced points required by the acceptance criteria and sequence of operations that were never delivered, plus equipment never integrated to the BMS — gaps tied to a month of schedule delay.

An acceptance-criteria mismatch

MelRok’s reports revealed that the acceptance-criteria intent differed from the written M&V document — prompting the design team to update the criteria.


BY THE NUMBERS

The scale, reconciled

35,000

points onboarded & registered

70+

analysis notebooks built

10,000

points per gateway

6 wks

to onboard the full system

From inconsistent paperwork to a working source of truth

A massive, inconsistent building automation system became a fully-registered, structured, continuously monitored one — and a reconciled record of what is actually installed that the client, the controls contractor, and the design team can all act on.

WHAT IT MEANS

At scale, the data is the source of truth

Documentation drifts. The building doesn’t.

On a system this large, submittals, names, and point lists inevitably fall out of sync with what’s actually installed.

Onboarding every point reconciles both.

Registering the whole system creates one accurate, current picture — and surfaces the spec gaps, integration misses, and criteria mismatches the paperwork hid.

One record everyone can trust

MelRok’s platform and its engineers become the single source of truth a large project can work from — turning a chaotic onboarding into a reconciled, monitored foundation, and catching costly gaps before they compound.

THE TAKEAWAY

Onboarded. Reconciled. Monitored.

MelRok turned a 35,000-point, poorly-documented healthcare BAS into a structured, continuously monitored system — and, along the way, into the reconciled source of truth the whole project could finally trust.